
Matt started tileing in the middle and worked his way out from there.

We also put a border on top.

Before

After. (The holes are where the fixtures will go: i.e. towel bar, shower shelf, etc.) If you look close, the spacers are still in between the tiles. We only got one wall done, because it took longer than we thought. But now that we're professionals, I'm sure the other walls will go quicker. There was one incident I wish I could have caught on camera - Matt was trying to do a "plunge" cut where you cut a short line in the middle of the tile without going to the edges. He wasn't exactly sure how to do it without the safety guard, and ended up spraying water into his face, on the ceiling, and the wall! It was hilarious to watch!
Video of Matt tileing.